Concrete structures which have settled or developed voids in or around them can be repaired by pressure grouting using various cement-based products. Additionally, abandoned pipes or pits can be filled to eliminate safety concerns. Engineered Restorations, Inc. uses custom tailored mix designs for each project to ensure optimum results. 

Atlanta Motor Speedway

Atlanta Motor Speedway

Epoxy Pressure Injection, Cementitious Grouting, Specialized Concrete Placement

Numerous wrecks into the concrete crash wall of turn number 3 at the Atlanta Motor Speedway had caused cracks and spalling. Rainwater was entering the cracks, compounding damage by freeze/thaw cycles. AMS personnel deemed the wall section too dangerous in its current state for an upcoming NASCAR race. Another concern was that a new “Safewall” system was due to be installed after the race. In its deteriorated condition, the wall section could not accommodate the Safewall anchorages and attachments. ERI devised a repair method consisting of low viscosity epoxy injection and high strength polymer modified mortar. Engineered Restorations, Inc. completed the repair in only three days, which provided a two day window prior to race-day, much to the relief of AMS personnel.

Buckhead Grande

Buckhead Grande

Epoxy Pressure Injection, Cementitious Grouting, Balcony / Plaza Deck Waterproofing, Vehicular & Pedestrian Traffic Coatings

2009 ICRI 2nd Place Project of the Year. Structural repairs to the 36 story luxury condominum in Atlanta, GA. Repairs included balcony slabs including concrete repair and injection, re-grouting of handrails and pedestrian traffic coating installation.

Capital City Country Club

Capital City Country Club

Cementitious Grouting

The Capital City Club is a private social club located in Atlanta, Georgia. Chartered on May 21, 1883, it is one of the oldest private clubs in the South. ERI was awarded the contract to grout unused abandoned CMP overflow pipe to prevent unwanted collapse due to deterioration and loss of structural integrity.  

MARTA Grout Pockets

MARTA Grout Pockets

Cementitious Grouting, Concrete Repair and Cleaning, Sealants and Caulking

ERI performed replacement of shear keys, construction joints, and post tensioned grout pockets on elevated MARTA rail lines throughout the city of Atlanta. Work took place on consecutive 54 hour shifts while the MARTA trains were in use utilizing single rail transport. The project was completed 6 months in advance of anticipated schedule.

North Highlands Spillway

North Highlands Spillway

Cementitious Grouting

Utilizing small steel barges with outriggers positioned upstream, ERI re-grouted over 5,000 LF of grout joints located on the face of the North Highlands Dam Spillway. Temporary diversion dams were installed at the crest of the spillway to divert water away from the work area. Repairs to the joints were completed utilizing non-shrink grout.