"It is our strong belief that Engineered Restorations and their team delivered the best product possible, and under the most difficult of conditions. The project was completed on-time and on-budget. They were outstanding to work with and we would recommend them to anyone in need of the services in which they specialize. "

— Randall Childers
Senior Director of Engineering
Hyatt Regency of Atlanta
 
Subscribe to Water / Waste Treatment
Atlanta Fulton County Water Treatment Plant – Clear Wells #1 and #2

Atlanta Fulton County Water Treatment Plant – Clear Wells #1 and #2

Concrete Repair and Cleaning, Expansion Joint Systems

ERI was hired during a routine maintenance shut-down to clean, repair and disinfect two clear wells at the AFCWTP. The process consisted of draining the clear wells, pressure wash the interior surfaces, remove residuals from the bottom surface, repair any damaged concrete, replace existing expansion joint material with 8" and 12" Combiflex expansion joints, and lastly disinfect interior surfaces utilizing approved AWWA methods.

City of Palmetto, GA Water Treatment Plant

City of Palmetto, GA Water Treatment Plant

Polyurethane Injection and Grouting, Concrete Repair and Cleaning, Crack Repair and Sealing, Polyurethane Injection and Grouting

Repairs of cracks and deteriorated concrete were performed at four settling basins at the City of Palmetto, GA water treatment facility. Repairs were achieved utilizing two component polymer modified mortar, polyurethane injection grout, and a two component polymer modified cementitious waterproofing. 

City of Savannah, Presidents Street WWTP

City of Savannah, Presidents Street WWTP

Epoxy Pressure Injection, Leak Testing & Investigation

The President Street Wastewater Treatment Plant is the main wastewater treatment facility for the city of Savannah, GA treating an average of 18 million gallons of wastewater per day. ERI has performed leak investigation and repair utilizing urethane grout injection and construction of custom roof curb assemblies.

James E. Quarles WTP, Emergency Repair of 2 MG Clear Well

James E. Quarles WTP, Emergency Repair of 2 MG Clear Well

Specialized Concrete Placement, Spall Repair and Patching, Sealants and Caulking

ERI successfully repaired a damaged clear well structure at the Quarles Water Treatment Plant in Cobb County Georgia. The repair work included jacking and supporting slabs, forming and pouring an additional support column inside the clear well, removing damaged concrete, coating exposed rebar, patching damaged concrete, and re-establishing the water-tight integrity of several construction joints. 