"The ERI personnel, under guidance of field Supervisor Mr. Austin McQueen, exhibited extraordinary teamwork as they remained focused on the client's needs and time constraints. The work at times proved challenging and was often performed under adverse weather conditions. ERI accomplished the work while maintaining a professional attitude throughout the project. They were especially innovative in identifying potential cost savings on the projects."

— Gary A. Clark, P.E.
Senior Engineer
Southern Company Generation - Hydro Services
 
Subscribe to Tunnels / Pipelines
City of Atlanta Peachtree Trunkline

City of Atlanta Peachtree Trunkline

Carbon Fiber Strengthening, Crack Repair and Sealing

Due to increased volume that led to pipe deterioration and failure, ERI performed structural repairs and strengthening utilizing CFRP, Carbon Fiber Reinforced Polymers, to existing 100 year old concrete pipe for the City of Atlanta.

HJAIA AGTS Tunnel & Guideway Repairs

HJAIA AGTS Tunnel & Guideway Repairs

Concrete Repair and Cleaning

ERI performed necessaray repairs to the concrete guideways and added supplemental steel support columns inside the tunnel that is home to the Automated People Movers at Hartsfield Jackson International Airport. This work was performed after hours so as not to affect the normal operations of the Airport.

Plant E.I. Hatch Nuclear Facility

Plant E.I. Hatch Nuclear Facility

Epoxy Pressure Injection, Specialized Concrete Placement, Crack Repair and Sealing

The Edwin I. Hatch Nuclear Plant, located near Baxley in southeastern Georgia, is one of Georgia Power's two nuclear facilities and is one of three nuclear facilities in the Southern electric system. ERI performed repair of joints and cracks to the intake / discharge tunnels and circulating water canals. ERI also performed specialized concrete replacement of deteriorated canal wall sections.