"Engineered Restorations did a detailed evaluation of the causes, recommended a solution and accomplished the repairs. Their personnel are well qualified, their communication with the owner has been excellent and the quality of their work is outstanding."

— James Parsons, P.E.
Director of Engineering
Cobb County - Marietta Water Authority
 
Subscribe to Transportation
Archibald Butt Memorial Bridge

Archibald Butt Memorial Bridge

Epoxy Pressure Injection, Spall Repair and Patching, Concrete Repair and Cleaning

95 year old bridge located in Augusta, GA was deemd structurally unsound due to deterioration and erosion of concrete support columns and foundation. ERI, working 7 days and week for 4 weeks, implemented repair methods that included full depth replacement of deteriorated concrete utilizing micro-silica enhanced concrete, fibrous polymer mortar repair of shallow spalls, and high strength epoxy resin injection of cracks. Once complete, bridge was re-opened and deemed structurally sound.

City of Savannah Bridge Repairs

City of Savannah Bridge Repairs

Epoxy Pressure Injection, Concrete Repair and Cleaning, Expansion Joint Systems

ERI performed structural restoration on four bridges located in the City of Savannah, GA. Repairs to the bridge included: installation of 500LF of DOT rated expansion joints, epoxy pressure injection of concrete cracks, patching of concrete on bridge decks and all required traffic control engineering and installation.

MARTA Grout Pockets

MARTA Grout Pockets

Cementitious Grouting, Concrete Repair and Cleaning, Sealants and Caulking

ERI performed replacement of shear keys, construction joints, and post tensioned grout pockets on elevated MARTA rail lines throughout the city of Atlanta. Work took place on consecutive 54 hour shifts while the MARTA trains were in use utilizing single rail transport. The project was completed 6 months in advance of anticipated schedule.

Industrial Associations & Partners