"The ERI personnel, under guidance of field Supervisor Mr. Austin McQueen, exhibited extraordinary teamwork as they remained focused on the client's needs and time constraints. The work at times proved challenging and was often performed under adverse weather conditions. ERI accomplished the work while maintaining a professional attitude throughout the project. They were especially innovative in identifying potential cost savings on the projects."

— Gary A. Clark, P.E.
Senior Engineer
Southern Company Generation - Hydro Services
 
Subscribe to Parking Structures
2000 & 2100 Riveredge Parking Decks

2000 & 2100 Riveredge Parking Decks

Spall Repair and Patching, Expansion Joint Systems

Work performed throughout the years on these parking decks located in Sandy Springs, GA include: miscellaneous concrete and spall repairs, replacement of expansion joints, installation of sealants, and installation of steel load transfer devices.

700 Galleria Parking Deck

700 Galleria Parking Deck

Spall Repair and Patching

ERI performed repairs and re-stabilization to existing precast concrete fascia panels. This work was accomplished by removing existing parapet caps and existing sealants to expose the embed connections and install new structural components necessary to provide proper bearing capacity.

Centennial Parking Deck at Philips Arena

Centennial Parking Deck at Philips Arena

Concrete Repair and Cleaning, Expansion Joint Systems, Caulking / Joint Replacement

ERI has performed structural and waterproofing services over several years on this structure including: column corbel repairs, cleaning and re-sealing of topping slab joints, crack repair in CMU and concrete walls, precast embed repairs, expansion joint replacement, spall repairs, and installation of concrete coatings. 

Decatur Plaza Parking Deck

Decatur Plaza Parking Deck

Masonry, Stucco and EIFS

Structural repairs that were performed on this parking deck include: installation of galvanized structural steel barriers and the removal and rebuilding of a CMU wall section. ERI also installed a new deck drain and repaired and painted existing EIFS walls.

Peachtree Center Parking

Peachtree Center Parking

Epoxy Pressure Injection, Spall Repair and Patching, Sealants and Caulking, Vehicular & Pedestrian Traffic Coatings, Striping and Sealcoating

Structural and architectural repairs included: routing of cracks and installation of polyurethane sealants, exposed rebar repairs utilizing polymer modified mortar, elastomeric acrylic coating at spandrel walls, application of vehicular traffic coating at top level, installation of deck drains to relieve ponding water, and epoxy crack injection.

Industrial Associations & Partners